Where Community and Comfort Meet

Creekside: Your Family’s Sanctuary

Creekside is a vibrant and conveniently located neighbourhood just minutes from Edmonton International Airport. The community provides a modern design with a diverse array of attainable housing styles. The area is characterized by a flowing creek accessible by wildlife, multi-way path connection systems, and creative designed green spaces, including toboggan hills for outdoor activities and recreation. Creekside’s commitment to environmental and wildlife protection makes it one of Metro Edmonton’s leading and environmentally sustainable communities.

AVENTERRA ESTATES PHASE 2 & 3

HBC HOME BUILDING PROCESS

All steps, timelines, and information are to be used for educational purposes only. Homes by Creation reserves the right to change this at any time without notice. All Homes are built on a case by case basis and may not reflect exactly what is shown below. All timelines shown can be affected by weather and other factors outside of Creation’s control and should only be used as an estimate.

  • PHASE 1 Permitting

    6 Weeks

    This Phase starts when the PSA is signed and the blueprints are completed and the application for a permit happens.

  • PHASE 2 Excavation and Foundation

    3 Weeks

    When we receive our permit, we schedule the excavation and foundation work. Foundation is waterproofed, inspected and backfilling happens.

  • PHASE 3 Framing and Window Installation

    2 Weeks

    We now begin the framing of your house and then have the windows installed

  • PHASE 4 Roofing, Siding and Exterior Finishing

    4 Weeks

    We now begin the framing of your house and then have the windows installed

  • PHASE 5 Servicing and inspections

    3 Weeks

    Next we have the electrical, plumbing and mechanical rough-ins. We then have inspections done.

  • PHASE 6 Insulation and Drywall

    3 Weeks

    At this stage we add insulation, then drywall and taping.

  • PHASE 7 Interior Finishing

    4 Weeks

    We then move onto the finishings, cabinets and painting

  • PHASE 8 Flooring

    2 Weeks

    Here we begin the floor and tile work, as well as any other hard

  • PHASE 9 Hardware, and Cleaning

    2 Weeks

    Any hardware that needs to be installed are done here. Once that’s completed, we do our finishing touches and finally send in cleaners to make sure your home is ready for your arrival.

  • PHASE 10 Welcome to your new Home

    1 Weeks

    This is as simple as scheduling you in for your final walkthrough and handing over the keys to your new home.

  • PHASE 11 Seasonal Work

    3 Weeks

    Every new home comes with front sod/grass and a tree or shrubs. Depending on what time of year you will be taking possession of you new home, when this process happens can vary quiet a bit.

Quick possessions in Springbank

All Quick possessions

Explore your apartments in Creekside

View Floor Plans

Map

Location of our projects

Map Placeholder

REACH OUT

Send Us a Quick Message